Temporary Center of the city district of Reichenau
./studio3 - Institute for Experimental Architecture / Technical University Innsbruck. Innsbruck, Austria
-
Name of work in English
Temporary Center of the city district of Reichenau
-
Name of work in original language
Temporäres Stadtteilzentrum Reichenau
Prize year
EUmies Awards 2019
-
Work Location
Innsbruck, Austria
-
Studio
./studio3 - Institute for Experimental Architecture / Technical University Innsbruck
EUmies Awards 2019 Nominees
Collaborators
Program
Ephemeral - Cultural & Social
Site area
320 m²
Total gross floor
220 m²
Completion
2018
Cost
550 €/m²
A total of 1000 new apartments will be built within the Campagne-Areal in the Innsbruck district Reichenau in the upcoming years. Even before construction work begins there will be a temporary district center. Designed, planned and even partially built by students of the faculty of architecture in Innsbruck - supervised by assistants of ./studio3 – institute of experimental architecture.
Taking account of this great change the town senate decided in 2017 to establish institutionalized district work in order to integrate the citizens into the building phase. The aim is to make the general public aware of the change, slowly sensitize and involve the population even long before the first residents are able to move in. Therefore the winning project of the open student competition provides space for information and enables exchange and encounters among the residents. The Vshaped building integrates climatecontrolled containers which are used as office space and offers a generously covered open space. It opens up to the street nearby and thus creates a smooth transition between the building and the existing public space. The new district center provides space for a variety of public events, room for people to gather and encourages community involvement.
Timber construction mit steel columns. Shipping containers covered with Plaspack full print frames.