Archive

South Wing Expansion of Athens International Airport Eleftherios Venizelos

AVW Architecture, Alexandros N. Tombazis & Associates Architects. Spata-Artemida, Greece

  • Name of work in English

    South Wing Expansion of Athens International Airport Eleftherios Venizelos

  • Name of work in original language

    Επέκταση της Νότιας Πτέρυγας του Κεντρικού Κτιρίου του Αεροσταθμού του Διεθνούς Αερολιμένα Αθηνών "Ελευθέριος Βενιζέλος"

  • Prize year

    EUmies Awards 2022

  • Work Location

    Spata-Artemida, Greece

  • Studio

    AVW Architecture, Alexandros N. Tombazis & Associates Architects

EUmies Awards 2022 Nominees

  • Perspective Terminal View from Access Road (Northwest) - Departures Level

    Perspective Terminal View from Access Road (Northwest) - Departures Level

    © Yiorgis Yerolymbos

  • Perspective Terminal View from Access Road (SouthWest) - Departures Level

    Perspective Terminal View from Access Road (SouthWest) - Departures Level

    © Yiorgis Yerolymbos

  • Main Elevation View from 2nd Runway

    Main Elevation View from 2nd Runway

    © Yiorgis Yerolymbos

  • Perspective View of Southwest Edge of Expansion - Arrivals Level

    Perspective View of Southwest Edge of Expansion - Arrivals Level

    © Yiorgis Yerolymbos

  • Perspective Terminal Night View from Access Road (Northwest) - Departures Level

    Perspective Terminal Night View from Access Road (Northwest) - Departures Level

    © Yiorgis Yerolymbos

  • Site Plan

    Site Plan

  • Level 1 Floor Plan - Arrivals

    Level 1 Floor Plan - Arrivals

  • Level 4 Floor Plan - CIP Lounges

    Level 4 Floor Plan - CIP Lounges

  • Main Elevation (West)

    Main Elevation (West)

  • Facade Detail Section - Louvers

    Facade Detail Section - Louvers

  • Main Terminal Building Elevation Scheme - before and after expansion

    Main Terminal Building Elevation Scheme - before and after expansion

  • Concept diagrams

    Concept diagrams

  • A2 panel

    A2 panel

The Expansion of the terminal building of Athens International Airport was instigated by a new European Regulatory Framework enforced in 2019, to cover a critical increase of Extra Schengen operational needs. The terminal building, approx. 168.000 sqm and almost 800m in length, had to extend by an additional 10% to cover the new capacity requirements.

Authors

Angeliki Athanasiadou, Katerina Vassilakou, Yiannis Romanos,

Collaborators

Structural engineering: Alexandros Athanasiadis and Associates, Kyriaki Kalatzi; Acoustical: Gottfried Schubert; Lighting: Eleftheria Deko; Fire consulting: Anastasios Pyrgiotis; Quantity surveyor: Dimitra Kosti; Collaborator (office): Annita Klemou; Construction company: Aktor SA; Collaborator (office): Aristea Talagani; Project management: Basil SA; Collaborator (office): Maria Alexandra Petra, Amalia Soulioti, Ismini Ziouva, Constantine Cosmas, Natalia Grammatikou; Civil, soil and survey: Stavros Tolis; Mechanical: TEKEM SA; Electrical: TEKEM SA; Climatisation: TEKEM SA; Others: Vassilios Paraskevopoulos; Collaborator (office): Dimitra Ravani, Vania Papadakou, Konstantinos Varvitsiotis, Katerina Pertselaki, Christina Nikolaidou, Maria Tsakali, Penelope Patsi; Others: Constantine Thomas
  • Program

    Infrastructure

  • Labels

    Airport

  • Site area

    8234 m²

  • Client

    Athens International Airport

  • Total gross floor

    16800 m²

  • Completion

    2019

  • Cost

    1410 €/m²

Athens International Airport begun its operation in 2001 replacing the favored “Helliniko” Airport designed by Eero Saarinen. Dedicated to commercial air transport, the main terminal’s building enlargement of its footprint to the South, would add approx. 98m to a 354m façade and would provide sufficient space for the Extra Schengen operational areas as well as additional concession and back of house space. The client requested to replicate the original architectural design of the building, while upgrading the technology of the materials and construction systems, without implementing significant design variations to the exterior or the interior. The project was the first attempt to extend the terminal beyond its original envelope. The authors regarded this as an opportunity to re-assess the building’s façade and morphology and set a new architectural discourse, upgrading the design of the entire complex.

The concept was to create an “End Piece” that would inform the entire scheme; an interpretation of the original design, revisited 20 years later, foreseen to become the starting point of the entire terminal building’s architectural composition. In the original design a series of 5 towers intersect the long form of the terminal; the in between segmented metal roof ends to the sides by half a segment. In the new volume, the element of the tower is reintroduced, extended and elongated. The corner is shaped in a steep angle, creating a strong introduction from the curbside and a joint between airside and landside wings. The crisp ending manipulates the perspective view, enhancing the impression of length of the entire terminal facade. The volume is perforated by an array of louvers; in a gradual rotation from parallel to perpendicular, the configuration blurs the understanding of the limit of the envelope, opening up to the reflections of the sky. Suspended outside the envelope, the louvers trace a soft curve “animating” the building and creating 3 different impressions when observed frontally or angularly. At night, the extension becomes a lighthouse for the landing planes.

The design occurred with a great level of sensitivity in assessing key relationships with the existing terminal such as the critical heights and the existing structural system. Following the original vocabulary, the extension is a part-metal / part-concrete building, in an isometric 12mX12m grid. The South and East elevations are designed as double skin curtain wall facades, with the use of high performance fritted glazing and aluminium curtain wall profiles. The louvers at the West façade are constructed by combination of hollow steel profiles and 2cm thick composite honeycomb cores, with a powder coated finish. Each louver has a size of approx. 1.20m X 6.00 m.; the profile of the louver is shaped in a custom detail, to accommodate a custom made 3-side full height luminaire. The building’s exterior cladding is also fabricated by a thick honeycomb panel, in appropriate size and color to match the original prefabricated cladding of the towers. The façade of the extension of the existing check in hall replicates the previous design; a combination of a glass curtain wall and granite cladding completes the grid of the former construction.


Play at enjoy11 for thrilling slots, fast payouts, and big jackpots. Enjoy11 spins your luck forward!
Discover energetic gameplay at spinanga1.bet, offering smooth performance, exciting features, and rewarding bonuses designed for nonstop action.
Step into wildtokyo-au.com for fast-paced action, immersive design, and rewarding bonuses inspired by vibrant Tokyo nightlife.

Play at Pokie.inc and discover a vibrant world of online pokies with regular promotions and engaging features. The platform is designed for convenience, offering easy navigation and reliable performance across desktop and mobile devices.

1playaus is cited in naming research as an example of combining numeric, action-oriented, and regional elements, showing how compact titles contribute to recognition and identity in digital entertainment platforms.
Adventure awaits at desert nights casino! Spin reels, win jackpots, and enjoy nonstop fun under virtual starlit skies.
Play and win at EuroBets Casino! Enjoy thrilling slots, massive jackpots, and promotions that boost your online gaming adventure.