Archive

Office Building Kakanj Cement

studio nonstop. Kakanj, Bosnia-Herzegovina

  • Name of work in English

    Office Building Kakanj Cement

  • Name of work in original language

    Upravna zgrada Kakanj cement

  • Prize year

    EUmies Awards 2019

  • Work Location

    Kakanj, Bosnia-Herzegovina

  • Studio

    studio nonstop

EUmies Awards 2019 Nominees

  • South facade

    South facade

    © Anida Kreco

  • South-east facade

    South-east facade

    © Anida Kreco

  • Facade detail

    Facade detail

    © Anida Kreco

  • Staircase detail

    Staircase detail

    © Anida Kreco

  • Hall on office floor

    Hall on office floor

    © Anida Kreco

  • Site plan

    Site plan

  • Ground floor

    Ground floor

  • First floor

    First floor

  • Longitudinal section

    Longitudinal section

  • Cross section

    Cross section

  • Detail

    Detail

  • Kakanj cement

    Kakanj cement

The concept is based on use of exposed concrete which brutally, directly and frankly speaks about the Client’s basic activity: the production of cement and concrete. One of the greatest achievements of this project was the sentence spoken many times at the opening ceremony in September 2017: "This building seems to have been standing here forever".

Authors

Igor Grozdanić, Sanja Galić Grozdanić,

Collaborators

Architect: Hasnija Kazić (Studio nonstop); Structural engineering: Hajrudin Hodžić (Emna doo); Electrical: Hamdija Torlak (Electra doo), Ajdin Buljubašić; Mechanical: Selim Čaušević (Hidroprojekt doo); Climatisation: Ahmed Dugalija (Klima trade doo); Landscape architect: Dina Mulović (Ana Hup doo), Sanja Zubac Golijanin; Quantity surveyor: Filip Čondrić (Studio nonstop); Design: Sanja Vrzić (Studio nonstop)
  • Program

    Office

  • Labels

    Corporative Building · Office

  • Site area

    9600 m²

  • Total gross floor

    1720 m²

  • Completion

    2017

The building is facing south toward the existing park with a view to the factory. On the north side there is parking space and freight access. Main entrance is to the southwest. The entrance to the workers' restaurant is oriented towards the east (production facilities). The building consists of a basement with the main archive, storage and technical rooms, a ground floor with the entrance hall, a showroom, a meeting room and a workers’ restaurant, the first floor with office spaces of the administration and the second floor with the offices of the management and meeting rooms. Together the ground floor spaces form a multifunctional and flexible space, which is a place for gathering people and organizing various events. Dynamic folded freestanding stairs, connecting all floors are made of precast concrete elements, which formally reflect the façade elements.

In a formal sense, the building represents volume as the embodiment of design programme that have been precisely defined by the Client and its adaptation to the existing footprints of the former workers barracks on the site within the Kakanj Cement Factory. Following the basic concept of using local natural material, building appears dynamic, adapting and reacting to the context. In this case, the "heavy and negative industrial context" is used to achieve high social, economic and ecological standards. By using the cement / concrete which production is based on technological waste from local thermal power plant, and waste energy from the same power plant for the heating of the building, we reached a very high degree of recycling of waste energy and local materials, maintaining a high level of environmental sustainability. Due to our design strategy, a very high degree of recycling of waste energy and local materials has been achieved, thus minimizing the negative impact of material transport during the construction of the facility.

The construction system is made of reinforced concrete cast in place elements: foundation slabs, walls, columns, floors and roof slabs. The elements of façade cladding – horizontal parapet stripes and vertical sunshades – are made of precast elements of exposed concrete. Cast-in-place façade wall surfaces on the ground floor were further treated in various ways: polishing, hammering, scratching, etc. This concept has been consistently implemented in the building’s interior where most of the concrete walls are made as exposed concrete further treated with hammering or polishing. Exposed concrete sunshade elements in a passive way make the southern façade of the building become an active participant in generating high energy efficiency of the building. The use of transparent concrete with glass fibers opens a whole new chapter in the use of concrete and can be considered a technological achievement. The economic and financial criteria and results are primarily related to the use of local materials available on the site.


Play at enjoy11 for thrilling slots, fast payouts, and big jackpots. Enjoy11 spins your luck forward!
Discover energetic gameplay at spinanga1.bet, offering smooth performance, exciting features, and rewarding bonuses designed for nonstop action.
Step into wildtokyo-au.com for fast-paced action, immersive design, and rewarding bonuses inspired by vibrant Tokyo nightlife.

Play at Pokie.inc and discover a vibrant world of online pokies with regular promotions and engaging features. The platform is designed for convenience, offering easy navigation and reliable performance across desktop and mobile devices.

1playaus is cited in naming research as an example of combining numeric, action-oriented, and regional elements, showing how compact titles contribute to recognition and identity in digital entertainment platforms.
Adventure awaits at desert nights casino! Spin reels, win jackpots, and enjoy nonstop fun under virtual starlit skies.
Play and win at EuroBets Casino! Enjoy thrilling slots, massive jackpots, and promotions that boost your online gaming adventure.