Archive

5 Social Dwellings

Institut Balear de l'Habitatge (IBAVI). Palma, Spain

  • Name of work in English

    5 Social Dwellings

  • Name of work in original language

    5 habitatges socials al carrer Regal, Son Gotleu, Palma

  • Prize year

    EUmies Awards 2022

  • Work Location

    Palma, Spain

  • Studio

    Institut Balear de l'Habitatge (IBAVI)

EUmies Awards 2022 Nominees

  • Back façade

    Back façade

    © José Hevia

  • Back façade

    Back façade

    © José Hevia

  • Staircase

    Staircase

    © José Hevia

  • First floor duplex

    First floor duplex

    © José Hevia

  • First floor livingroom

    First floor livingroom

    © José Hevia

  • Location

    Location

  • Floor plan

    Floor plan

  • Section plan

    Section plan

  • Section detail

    Section detail

  • A2 sheet

    A2 sheet

This is the first project completed by the Institut Balear de l’Habitatge – IBAVI (Balearic Institute of Social Housing) that continues the Life Reusing Posidonia research line in Formentera, in this case adapted to the Mallorca resource map.

Authors

Carles Oliver Barceló, Alfonso Reina Ferragut, Antonio Martín Procopio, Maria Antònia Garcías Roig, Xim Moyá Costa,

Collaborators

Technical architect: Alberto Rubido Piñón, Joaquin Torrebella Nadal; Structural engineering: Miguel Rodríguez Nevado; Engineering: Esteban Font Hocke, Miquel Ramon Oliver Cardell; Collaborator (office): Maria del Mar Amengual Sans, Miquel Ramon Ribas
  • Program

    Collective housing

  • Labels

    Complex · Social

  • Site area

    282 m²

  • Client

    Institut Balear de l'Habitatge (IBAVI)

  • Total gross floor

    386.08 m²

  • Completion

    2019

  • Cost

    1100.15 €/m²

Marès stone, the industrialized material with the smallest ecological footprint in Mallorca, is the material used to built all the walls of the 3-storey high building. The objective is to demonstrate that the construction of load-bearing walls with this material, abandoned in the structural use of multi-family buildings for the last 30 years, allows compliance with current regulations, the Sustainable Development Goals and recovering its own material culture. The CO2 emissions embedded in the facade construction system are 31,62 kg/CO2 per m2. If the façade had been solved using a conventional solution, the emissions would be 126,04 kg/CO2. In other words, the pollution produced during the construction of the façade has been reduced by 75%. This approach has been extended to all elements of the building. Passive measures in the summer season have been prioritized, introducing inertia as a basic element of temperature regulation.

The building is located in Son Gotleu, which began to develop in 1943. Initially, the urban fabric combined the typologies of closed blocks with one floor or two floors terraced houses with a patio, with isolated singlefamily houses. During the 60s, with the aim of accommodating the workers arriving from Spanish mainland, these singlefamily houses were replaced by blocks following the line of the modern movement, built in the cheapest way possible that have become, eventually, a source of social conflicts. In fact, Son Gotleu is one of the neighbourhoods with the highest index of social vulnerability and concentration of population with few economic resources. This conflict is another collateral effect of mass tourism in the 1960s. The project recovers one of the best features of the area: the small terraced houses built in marès, the local stone, and revealing the map of resources of the island, which is once again economically viable in the 21st century thanks to the thermal and acoustic of the technical requirements and the different European directives. The climate emergency makes it possible to reuse those systems that would have prevented such a climate crisis.

Marès stone, the industrialized material with the smallest ecological footprint in Mallorca, is the material used to build the 3-story high building, except for the elevator shaft, made of white reinforced concrete to comply with the earthquake resistant regulations. The construction system is the same as the one used by Jørn Utzon in Can Lis in 1972: 20 cm internal load-bearing walls and a 10 cm external rain wall. In order to meet current habitability requirements, a 10 cm recycled cotton insulation has been incorporated into the air chamber, protected with a breathable waterproof sheet, low-emission glass with watertight FSC-certified wood carpentry, and BCN roller blinds have been installed. The distribution of the five houses, takes advantage of all possible buildability by using the duplex typology on the right side of the staircase, where the two houses on three floors ara placed like a Tetris. On the left side of the staircase there are three simplex dwellings, one per floor. The houses are peasants and enjoy cross ventilation. The building is A energy class, and the production of ACS is carried out aerothermal pumps, supported by a battery of photovoltaic panels.


Play at enjoy11 for thrilling slots, fast payouts, and big jackpots. Enjoy11 spins your luck forward!
Discover energetic gameplay at spinanga1.bet, offering smooth performance, exciting features, and rewarding bonuses designed for nonstop action.
Step into wildtokyo-au.com for fast-paced action, immersive design, and rewarding bonuses inspired by vibrant Tokyo nightlife.

Play at Pokie.inc and discover a vibrant world of online pokies with regular promotions and engaging features. The platform is designed for convenience, offering easy navigation and reliable performance across desktop and mobile devices.

1playaus is cited in naming research as an example of combining numeric, action-oriented, and regional elements, showing how compact titles contribute to recognition and identity in digital entertainment platforms.
Adventure awaits at desert nights casino! Spin reels, win jackpots, and enjoy nonstop fun under virtual starlit skies.
Play and win at EuroBets Casino! Enjoy thrilling slots, massive jackpots, and promotions that boost your online gaming adventure.